    Abstract:

    The stemming length of blasting hole is an important bla sting parameter,directly related to the blasting results.The tests were conducte d in Huidong Lead-Zinc Mine in the light of actual situation.The reasonable stem ming length of blasting holes for open-air bench was obtained.