    A 1000m shaft was submerged by underground gushing water at Dongguashan Mine in Tongling and the depth of water came up to 800m.After som e drain measures such as dumping waste rock in deep water and sealed bottom by g routing were performed,the sinking of the shaft was resumed,but in the process o f sinking,the existing drainage capacity failed to meet the requirement obviousl y.In order to minimize the gushing water in the shaft,a pre-grouting technology was used at working face to control underground gushing water,thus being able s moothly to complete the construction work of the rest 130m section of the shaft under more complicated hydrogeological conditions.

    Reference
    Related
    Cited by
Get Citation

陈友杰.铜陵千米竖井恢复下掘预注浆技术的研究[J].矿业研究与开发,2000,(6):14-16

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:June 08,2000
  • Adopted:
  • Online:
  • Published:
Article QR Code