New Roof-Contacted Filling Technics in Caolou Iron Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    采空区接顶充填效果对充填采矿法矿山的安全和生产都有较大影响,草楼铁矿根据该矿具体情况总结出了一套新的接顶工艺,虽然工序较传统的略有增加,但其接顶率很高,在实际生产中取得了很好的效果,为该矿后继的采充作业提供了强有力的技术保障,同时也可为类似矿山的接顶充填提供参考。

    Abstract:

    Roof-contacted filling of mined-out area has considerable influence on safety and production of mine in witch filling mining method is used.In Caolou Iron Mine,a new roof-contacted filling technics was developed according to the concrete conditions.This technics have a slight increasing working procedure contrast to conventional technics,but the rate of roof-contacted can be very increased,resulting in good effect in practical production.It provide a strong technical support for the later mining and filling in the mine and a reference to similar mine.

    参考文献
    相似文献
    引证文献
引用本文

江宁,邓代强,姚中亮.草楼铁矿充填接顶新工艺[J].矿业研究与开发,2010,(3):18-19,84

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-06-17
  • 出版日期: