龙首矿500万吨矿井建设问题分析与对策研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

F426.1

基金项目:


Problems of Engineering Construction for Annual Production Capacity of Five Million Tons in Longshou Mine and Its Countermeasures
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    系统分析了龙首矿目前的生产格局和重点项目建设基本情况,在科学论证的基础上,规划了龙首矿2014年实现500万t出矿目标的阶段步骤,研讨了龙首矿建设500万t大型井下矿山存在的主要问题,从建设管理、回采工艺、劳动效率、资源保障等方面相应提出了切实可行的对策和措施。

    Abstract:

    This paper systematically analyzes the layout of pro- duction and the basic situation of major construction projects at present in Longshou mine,plans the stages and steps to realize the goal of annual ore output of 5 million tons in 2014,discusses the main problems of the large - scale underground mining engineering construction for the annual 5 million tons in this mine, and proposes practical countermeasures and measures in terms of the management of construction projects,mining technology, working efficiency and the guarantee of resources,etc.

    参考文献
    相似文献
    引证文献
引用本文

姚维信,把多恒,孟宪华.龙首矿500万吨矿井建设问题分析与对策研究[J].矿业研究与开发,2009,(6):101-105

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-06-18
  • 出版日期: