黄麦岭磷矿露天边坡稳定性数值模拟
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD854.6

基金项目:


Numerical Simulation of Stability of Open-pit Slope in Huangmailing Phosphorite Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    对黄麦岭露天磷矿采场边坡工程地质状况进行了分析,设计了黄麦岭磷矿采场边坡工程稳定性离散元数值模拟的模型,分析了控制参数的选择原则及方法,对黄麦岭露天磷矿采场边坡工程稳定性的模拟结果进行了分析,给出了该矿开采中产生失稳的部位及失稳机理,对该矿的后续开采提出了合理建议。

    Abstract:

    The Engineering geology of open - pit slope in Huangmailing phosphorite mine was analyzed. A discrete element method for numerical simulation of open-pit slope stability in this mine was designed,and the selection principle and method of and control parameters was analyzed. The results of stability simulation of slope in this mine were analyzed,the instability mechanism and position of slope during mining were showed,some suggestions were brought forward for the continuing mining in this mine.

    参考文献
    相似文献
    引证文献
引用本文

李一帆,王慧萍,李作良.黄麦岭磷矿露天边坡稳定性数值模拟[J].矿业研究与开发,2009,(6):9-10,16

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-06-18
  • 出版日期: