基于WBS-RBS与“一法三卡”的工程项目安全管理
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

F281

基金项目:


Safety Management of Engineering Projects Based on WBS-RBS and "One Law and Three Cards"
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合工程项目安全管理的特点,运用WBS-RBS原理,对工程项目进行风险评估,确定出各施工工序中的危险源,再根据"一法三卡"方法,加强对危险源的管理,做到超前预防,重点监控,全员参与,防患于未然。实践证明,WBS-RBS与"一法三卡"相结合,是一种具有针对性、实用性、可追溯性和创新性的安全管理模式。

    Abstract:

    In order to solve problems existing in the safety management of engineering projects,according to the characteristics of safety management of engineering projects,it was put forward to make risk assessment of engineering projects applying WBS-RBS principle,identify risk sources in the construction process,then strengthen the management of risk sources by "one law and three cards",prevent accidents in advance,lay stress on safety supervision and control,make full employment engage in safety management,prevent troubles before they happen.Practice has proved that the combination of WBS-RBS and "one law and three cards" is a special,practical,traceable and innovative safety management mode.

    参考文献
    相似文献
    引证文献
引用本文

胡仲春,刘军,梁化磊.基于WBS-RBS与“一法三卡”的工程项目安全管理[J].矿业研究与开发,2009,(3):68-69,79

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-06-18
  • 出版日期: