Abstract:In the design of roadway excavation in hardy and difficult-to-blasting rock,a new double-wedge cutting method combining with smooth blasting technology was adopted.Through theoretical analysis,the blasting parameters,such as the diameter,length,number pattern and explosive load of blast hole,specific charge,the explosive of ignition at one time and so on,were determined.The correctness of determining methods of these parameters was validated by a case of application.