Risk Analysis and Forecast of Exploiting the 16th Line Vertical Pillar in No.2 Mining Area of Jinchuan Group Ltd
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    叙述了金川二矿区16行垂直矿柱开采前的状况,介绍了16行垂直矿柱开采的依据及回采实践,从开采安全性、矿山地压活动、矿山整体稳定性3个方面对16行垂直矿柱开采的风险进行了分析与预测,相应提出了16行垂直矿柱安全回采的合理建议。

    Abstract:

    The original status of the 16th line vertical pillar in the No.2 mining area of Jinchuan Group Ltd are narrated,the bases and practice of exploiting the pillar are introduced as well.The risks of exploiting the 16th line vertical pillar are analyzed and forecasted from three aspects: security of exploitation,ground pressure activity and mine's overall stability.According to the analysis and forecast of risk,several reasonable suggestions are given for the safe exploition of the 16th line verticat pillar.exploit the pillar high efficiently.

    参考文献
    相似文献
    引证文献
引用本文

高建科,张海军,贾永军,苏永定,陈怀利.金川二矿区16行垂直矿柱的开采风险分析与预测[J].矿业研究与开发,2008,(1):1-2,18

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2007-03-17
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: