Based on uniform design method,through back-analysis of displacement of underground chamber for Xiaowan Hydropower Project,the material parameters and stress field of rock near underground chamber are acquired,and the displacements of the chamber during the late excavation are pre-estimated,pre-estimated results are consistent with the real monitored results.It is proved that uniform design method has relatively high practical value and an extensive prospect of application in displacement back-analysis of underground engineering.