    摘要:

    针对矿岩破碎、高地应力以及采用下向高强度混凝土胶结充填法采矿的特点,提出了在胶结充填体中预留平巷的方案,并采用合理的施工和支护工艺。实践证明,该工艺不仅保证了预留巷道稳定,有效减少了巷道返修量,而且预留工艺简单易行、成本低、实用性强,施工快捷。

    Abstract:

    According to characteristics of some mine such as fractured ore/rock, high in situ stress, and filling underhand stoping drift with high strength concrete, this paper put forward a scheme that level laneway is set in advance in cemented filling body and some reasonable construction and supporting technologies are adopted. The practices prove that the scheme not only can ensure the stability of pre - set laneway and effectively reduce the maintain of laneway, but also is simple in technics, low in cost, high in practicability, short in construction time and so on.

    参考文献
    相似文献
    引证文献
引用本文

王贤来 崔继强 李庆荣 安文杰.下向进路式胶结充填采矿法中巷道预留技术实践[J].矿业研究与开发,2007,(1):5-6,27

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2006-09-27
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: