    摘要:

    土钉墙近年来在基坑支护中得到了广泛应用,取得了不少成就,但也有部分土钉墙支护因某些原因导致失稳破坏。以实际工程为例,从地质条件、设计及施工等方面分析确定了基坑失稳的原因,提出了解决方案,经实施取得了良好效果。

    Abstract:

    The soil-nailed wall is widely applied to the support of foundation pit in recent years,and many achievements have obtained,but the load instability occurs in some soil-nailed walls because of certain reasons.In this paper,taking the some project as example,the factors influencing the stability of the foundation pit are analyzed,the causes of the failure are found out from geological condition,design and construction and so on.A solution scheme was put forward,the good effect was achieved after the implement of the solution scheme.

    参考文献
    相似文献
    引证文献
引用本文

李爱民 许梦国 孙丽军 崔波 张滔.某基坑土钉墙支护局部失稳分析[J].矿业研究与开发,2006,(5):22-24

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2005-10-27
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: