Abstract:According to the terrain, the geology, environmental condition and engineering request of the project, the scheme, parameters, initiation network and millisecond delay intervals of the chamber blasting with linear charges were designed rationally, so that the possible earthquake disaster induced by the blasting was avoided. The results obtained by use of model Blastmate In vibration monitoring instrument indicated that the effect of vibration reduction measures was better, the expected require ment of design had been achieved.