顺槽煤柱合理尺寸的三维数值模拟
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD322.2

基金项目:


Three Dimensional Numerical Simulation of Reasonable Size of Coal Pillar Protecting Sublevel Roadway
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    根据上榆泉煤矿的开采条件,采用三维有限差分法模拟分析了采煤工作面推进150m时,工作面前后方不同距离处受采动影响侧向围岩破坏特征和应力分布,据此,确定上榆泉煤矿10^#煤层综放开采的顺槽煤柱尺寸应取16~20m。

    Abstract:

    In the light of the mining conditions of Shangyuquan coal mine, the three dimensional finite difference method was adopted to simulate and analyze the failure features and stress distribution of side wall rock affected by extracting activity where was at front or back some distance from the coal caving face of which the advance reached 150m. According to that, the width of coal pillar protecting sublevel roadway should be determined as 16 - 20m for the fully -mechanized sublevel coal caving of No. 10 coal seam in Shangyuquan coal mine.

    参考文献
    相似文献
    引证文献
引用本文

刘增辉 康天合 李东勇.顺槽煤柱合理尺寸的三维数值模拟[J].矿业研究与开发,2005,(4):27-29

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2004-08-26
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: