高峰矿区100号矿体采空区治理与地压监测研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD752.2 TQ658.41

基金项目:


Mined -out Area Treatment and Ground Pressure Monitoring for the No. 100 Orebody in Gaofeng Mine Section
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了针对高峰矿区100号矿体特大事故隐患实施的采空区治理工程及其地压监测成果。高峰矿业有限责任公司采取了构筑钢筋混凝土或高强度混凝土隔离层、实施水砂胶结或块石充填和封闭采区等综合治理措施,并建立地表岩层移动观测站和井下地压监测系统,取得了显著成效。

    Abstract:

    In Gaofeng mining section, the comprehensive measures was adopted to treat the mined-out area existed in the No.100 Orebody, including building armoured concrete or concrete isolation layers with high strength, filling the mied-out area with cemented sand or waste boulder, sealing the mied-out area, a surface observation station and an underground monitoring system had been built to observe the displacement of strata or monitor ground pressure, resulting in remarkable success.

    参考文献
    相似文献
    引证文献
引用本文

黄应盟 邓金灿 毛建华 叶粤文.高峰矿区100号矿体采空区治理与地压监测研究[J].矿业研究与开发,2005,(3):18-19,25

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: