孝义铝矿索道运输掉斗原因的分析和改进措施
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD527

基金项目:


The Causes for Bucket Falling in Ropeway Haulage and the Improving Measures in Xiaoyi Bauxite Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    孝义铝矿索道运输矿斗经常出现掉斗现象,严重影响山西铝厂的矿石供应。在对掉斗原因进行分析的基础上,提出了相应的改进措施,提高了矿斗零部件的可靠性和使用寿命,改善了矿斗的结构设计,实施后掉斗率由19%降至1.8%。

    Abstract:

    The frequent bucket falling accidents of aerial ropeway haulage in Xiaoyi Bauxite Mine greatly influence the ore delivery to Shanxi Aluminum Works. Based on the analysis of the causes of bucket falling,some relevant improving measures were put forward such as increasing the reliability and service life of the parts of buckets,improving the structure design of buckets. Through the implementation of these measures,the probability of bucket falling has been reduced from 19% to1.8%.

    参考文献
    相似文献
    引证文献
引用本文

黄瑞青.孝义铝矿索道运输掉斗原因的分析和改进措施[J].矿业研究与开发,2003,(4):40-42

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2003-03-12
  • 录用日期:
  • 在线发布日期:
  • 出版日期: