Abstract:In this paper, a series of implementation links of the deep development project in Fankou Lead-zinc Mine are analyzed comprehensively, including feasibility study, investment evaluation, the design of engineering drawing, bidding and tendering, management of contracts, organizing of construction, settlement account of construction, etc. The authors consider that the cost of the construction project be better controlled by deepening the managements of these links.