基于PowerBuilder的矿山井下车间成本MIS的开发
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD672

基金项目:


Development of Cost Management MIS for Underground Mining Workshops Based on PowerBuilder
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    利用PowerBuilder7.0和SQL Server2000开发了金山店铁矿井下车间的成本管理系统,该系统具有数据查询、表格生成、分析统计、图表显示等功能,已成功投入使用。本文介绍了开发思想、开发工具、系统实现,并介绍了开发过程中编程的关键技术。

    Abstract:

    Based on PowerBuilder 7.0 and SQL Server 2000, a cost management information system has been developed for the underground mining workshop of Jinshandian Iron Mine. The cost management MIS has functions of featuring data inquiring, form building, statistics analyzing and graph displaying, and has been put to use successfully. This paper presents the development conception, development tools, implementation of the system along with the key programming techniques adopted in the development process.

    参考文献
    相似文献
    引证文献
引用本文

姜谙男,孙豁然,赵德孝.基于PowerBuilder的矿山井下车间成本MIS的开发[J].矿业研究与开发,2002,(4):33-35,42

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: