程潮铁矿过渡分段合理放矿制度的试验研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD861.1 TD853.362

基金项目:


An Experimental Study on the Rational Ore Drawing Rule for the Transit Sublevel in Chengchao Iron Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对程潮铁矿无底柱分段崩落法的采场结构参数调整后过渡分段可能存在的主要问题,采用理论计算和室内物理放矿模拟的手段,研究了合理的放矿截止品位,以及过渡分段矿石贫化率和回收率变化的规律,最终确定了过渡分段合理的放矿制度。

    Abstract:

    As the structural parameters of stopes were modified in the subdrift caving system in Chengchao Iron Mine, some problems might be encountered. In light of the major problems that might occur, the rational cut-off grade for ore drawing was studied and the changing rules of the ore dilution and recovery on the transit sublevel were investigated through theoretical calculation and indoor physical simulation of the drawing process. Finally, the rational drawing rule was determined for the transit sublevel.

    参考文献
    相似文献
    引证文献
引用本文

宋卫东,匡忠祥.程潮铁矿过渡分段合理放矿制度的试验研究[J].矿业研究与开发,2002,(4):24-26

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2002-02-09
  • 录用日期:
  • 在线发布日期:
  • 出版日期: