铜矿峪矿浮选工艺流程的改造
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD92

基金项目:


Renovation of the Flotational Flow Sheet in Tongkuangyu Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    铜矿峪矿选矿厂的磨矿系列与浮选系列成对应布置形式。一旦浮选系列出现故障,则磨矿系列必须停机,加之浮选系列使用时间较长,对其改造已势在必行,通过对磨矿系列和浮选系列配置的改造,经生产考查,明显提高了球磨机的运转率和浮选机的生产能力,获得了较好的经济效益。

    Abstract:

    In the concentration plant of Tongkuangyu Mine, the milling system is deployed correspondent to the flotational system. Once a breakdown happens to the flotational system, the milling system must come to a halt correspondingly. As the flotational system has been commissioned for a long time, technical renovation is imperative. Therefore, the disposition of milling system and flotational system have been renovated technically. Operation of the modified flowsheet shows that the renovation has remarkably enhanced the availability of the milling system and the productivity of the flotational system, leading to good economic return.

    参考文献
    相似文献
    引证文献
引用本文

杜志杰.铜矿峪矿浮选工艺流程的改造[J].矿业研究与开发,2002,(3):35-36

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2002-01-19
  • 录用日期:
  • 在线发布日期:
  • 出版日期: