    摘要:

    针对安庆铜矿-400~-510m中段西部厚大区域矿房采场实行双阶段回采之后矿柱的回采问题,以及-510m中段上、下部采场衔接及回采顺序等问题,提出在1^#矿体-560m中段西部采场采取“房柱对应布置、错开回采”的采矿方案,并提出了回采技术措施。

    Abstract:

    In Anqing Copper Mine, the extra-large room stopes in the west area of the -400m to 510m level are mined out using a double-benched mining system. Thereafter, recovery of pillars, linkage of upper and lower stopes at the -510 level as well as the mining sequence are studied. As a result, a mining system with rooms and pillars laid out correspondingly while staggering the stoping process is proposed. Technological measures are put forward with regard to actual stoping.

    参考文献
    相似文献
    引证文献
引用本文

吴江海.采场房柱对应布置错开回采方案的研究[J].矿业研究与开发,2001,(4):4-6

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2001-04-12
  • 录用日期:
  • 在线发布日期:
  • 出版日期: