诺兰达炉炉结炉村控制爆破拆除
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD235.37

基金项目:


Demolition of Noranda Furnace Slag and Liner by Controlled Blasting
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    诺兰达炉炉结炉衬每两年须拆除一次,由于振动和高温等原因,目前国外均采用机械法拆除。根据对大冶公司冶炼厂诺兰达炉炉结炉衬的高温减振爆破拆除的实践,详细介绍了爆破拆除方案的选择、炮孔布置参数、装药量、装药结构、起爆网络和安全防护措施。通过对整个爆破过程中振动监测,得出了诺兰达炉炉结炉衬完全可以用控制爆破快速拆除的结论。

    Abstract:

    The slag and liner of a Noranda furnace must be demolished once every two years. Due to the danger of vibration and high temperature, demolition is usually done mechanically outside China. In Daye Nonferrous Metals Corp, demolition is done using controlled blasting in a high temperature environment. This paper presents the selection of blasting method, blast hole patterns, the charge volume and structure, priming network and the safety precautions. Through monitoring of the blasting vibration, it is concluded that the slag and liner of a Noranda furnace can be demolished by controlled blasting with high efficiency.

    参考文献
    相似文献
    引证文献
引用本文

史秀志 宋光明 等.诺兰达炉炉结炉村控制爆破拆除[J].矿业研究与开发,2001,(3):35-37

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2001-03-16
  • 录用日期:
  • 在线发布日期:
  • 出版日期: