Abstract:For recovery of residual interstall pillars in Tonglushan Mine, field rock mechanics was investigated. Based on the results, stope stability for different stoping methods for recovering these pillars was studied using finite elementary numerical analysis. As a result, the most appropriate mining method with reasonable stope structure parameters was adopted, having achieved desired results.