Abstract:The rock mass in the xiaohe station section of Xikang Ra ilroad line is fair soft and broken.In the excavation of road foundation,pre-sp litting blast technique was used to ensure the stability of slopes,uncoupled cha rging and air-deck charging were adopted in operation so as to achieve reasonabl e blasting results.The experience can be used for reference in per-splittin g blasting under similar circumstances.