Abstract:As the shape of orebody changes too much and the mining technology is not standard,thus resulting in heavy loss in mining and lower capacity of stope,Jinshan Gold Mine can not suit the need of present production development.Therefore,this paper,in light of the actual situation of the mine,made a comparison between suitable mining methods with comprehensive selection method for maximum profit and had a detailed discussion on mining method selection for the mine.