会东铅锌矿露天地下联合开采方案的探讨
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD856.1

基金项目:


An Approach to the Scheme of Surface and Underground Combined Mining in Huidong Lead Zinc Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    会东铅锌矿初步设计的露天地下联合开采方案,确定地下采矿从露天坑底1980m 水平开始,用下向分层进路胶结充填法采矿,并逐步形成厚36m 的隔离柱,但该方案已不适应该矿的实际情况。本文讨论了5种调整方案,并认为地下首采区选择在露天坑底水平以外,能扩大露天采矿范围,减少隔离柱构筑费用,且露天开采和地下开采互不制约。

    Abstract:

    In the Surface and underground combined mining scheme of the primarg design in Huidong Lead Zinc Mine,it was decided to start underground mining at 1980m tevel under the open pit bottom by downward slice and drift mining with cemented filling and gradually form a 36m thick separation pillar,howerer this scheme was not suited to the actual situation of the mine already.This paper discussed five modified schemes and considered that the initial underground mining area selected outside the open pit bottom was able to expand open pit mining range,reduce the construction cost of separation pillar and eliminate interfernce between open mining and underground mining.

    参考文献
    相似文献
    引证文献
引用本文

段恒建,严荣生,宋嘉栋.会东铅锌矿露天地下联合开采方案的探讨[J].矿业研究与开发,1999,(Z2):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: