Abstract:For concrete placement Using drawbar-Combined Single-plate arch center in lining tunnel, both the fixing mould and demoulding,not only take a lot of time and a large quantities of Labour, but also resut in low efficiency. However, when built-up Concrete truck is applied to the concrete placing long-distance and large section permanently tunnel the goals of improving quality and increasing operating efficiency as well as reducing Cost can be achieved.