The Operation of Backwall Injection at CrossCut for New South AirShaft in Tonglushan Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    铜绿山矿新南风井-185m石门围岩条件复杂,有一较大裂隙穿过该地段,石门原已施工混凝土拱墙支护,在进行出水点顶水注浆前压水试验时,发现该支护段大量漏水,遂采取壁后注浆,取得了满意的效果

    Abstract:

    The geological condition of host rock is complicated and a wider fissure cross over at -185m crosscut for new south airshaft in Tonglushan Mine. The arch and walls of crosscut was primary supported with concrete lining. But during the pressing water test before grouting against water at the water outlet, it was founded that a great deal of water leaks happened in the supported zone. And then a backwall injection was applied to the zone with a satisfactory result.

    参考文献
    相似文献
    引证文献
引用本文

胡五洲.铜绿山矿新南风井石门壁后注浆施工[J].矿业研究与开发,1999,(Z1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: