    摘要:

    通过对深部铜矿露天坑底部废石覆盖层块度分布及流动性能的分析研究,确定在矿块一步回采后采用水泥尾砂胶结充填,二步回采后直接利用上部废石覆盖层充填的技术方案。该方案技术难度大,但经济效益显著,为露天转井下生产的矿山充填提供了借鉴。

    Abstract:

    Through an analysis and investigation on the fragment size and flow characteristic of the waste overburden at the open-pit bottom of Deep Copper Mine,it was determined that a scheme of using cemented tailings fill after the first step mining(10 m span) of ore block and then directly utilizing the above waste overburden for filling after the second step mining (20 m span) should be adopted.This scheme is difficuilt in technology but its economic result is obvious so that it can be used for reference to the mines turning from open-pit mining into underground mining.

    参考文献
    相似文献
    引证文献
引用本文

徐兰军.废石—尾砂充填采矿法试验研究[J].矿业研究与开发,1999,(6):8-11