Abstract:The stability of ore and rock in Lianjiang Silver Mine is very poor so that an overhand slice and drift mining with cemented tailings filling was used for mining.Roof-contacted filling is one of the critical techniques for this mining method. This paper introduced the comprehensive technology of forced roof-contacted filling,individual area filling and sebusequently regional filling used in the mine,this technology made the problem of roof-contacted filling of drift to be solved.