廉江银矿采场接顶充填技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD863 TD853.34

基金项目:


Stope-Roof-Contacted Filling Technique at Lianjiang Silver Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    廉江银矿的矿岩稳固性很差,采用上向进路尾砂胶结充填采矿法,接顶充填是该采矿法的关键技术之一,本文介绍了该矿采用的强制接顶充填,分区充填及嗣后区域充填的综合技术,该技术解决了进路充填接顶的难题。

    Abstract:

    The stability of ore and rock in Lianjiang Silver Mine is very poor so that an overhand slice and drift mining with cemented tailings filling was used for mining.Roof-contacted filling is one of the critical techniques for this mining method. This paper introduced the comprehensive technology of forced roof-contacted filling,individual area filling and sebusequently regional filling used in the mine,this technology made the problem of roof-contacted filling of drift to be solved.

    参考文献
    相似文献
    引证文献
引用本文

肖凤元 褚洪涛.廉江银矿采场接顶充填技术[J].矿业研究与开发,1999,(5):17-19

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: