铜坑矿91号矿体的地压研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD323

基金项目:


Research on Ground Pressure for Mining No.91 Orebody in Tongkeng Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    概述了大厂铜坑91号矿体在开采过程中出现的地压问题,指出了该矿体开采中坟活动的特征,空区充填顺序,矿柱回采顺序以及应采取的地压监控措施,这对保障该矿体中矿柱的安全回采,提高矿山经济效益均有重要意义。

    Abstract:

    The authors generalized the ground pressure problems occured in the process of mining No. 91 orebody in Tongkeng Tin Mine,and pointed out the characteristic of ground pressure activity,the filling sequence of mined-out areas,the mining sequence of the ore pillars and the miniforing and controlling measures of the ground pressure which should be adepted during mining No.91 orebody.These are of great importance to the safety mining of ore-pillars and the increase of economical benefits of the mine.

    参考文献
    相似文献
    引证文献
引用本文

朱明亮 刘湘平.铜坑矿91号矿体的地压研究[J].矿业研究与开发,1999,(5):8-10,14

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: