Abstract:In the construction of mine shaft, the cageway girders were always installed by use of the sinking in situ method or the reserved hitch method. However, the methods of reserved position setting and repair sinking etc have influence on the progress in installation. Using the quick setting early strength cement bolt spools for the installation of cageway girders can attain the aims of speeding the installing progress, improving the quality and reducing the costs.