凤凰山铜矿充填采矿技术的应用与发展
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD862.1

基金项目:


Application and Development of Mining Technique with filling in Fenghuanshan Copper Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    凤凰山铜矿自投产以来,采用了上向水平分层充填采矿法,大直径深孔嗣后充填采矿法和无间柱连续开采充填法。在多年的生产实践中,该矿的充填采矿技术得到了不断的发展和完善。作者针对矿山的实际,对现行采矿方案的改进提出了建议。

    Abstract:

    Overhand horizontal cut and fill stoping, large diameter long hole stoping with subsequent filling, and backfilling method with continuous stoping without stope pillar have been applied at Fenghuangshan Copper Mine since it went into operation. The mining technique with filling has been uninterruptedly developed and improved in production practice over many years at the mine. Author suggests improving current stoping scheme in view of the mine reality.

    参考文献
    相似文献
    引证文献
引用本文

张亚海.凤凰山铜矿充填采矿技术的应用与发展[J].矿业研究与开发,1999,(1):28-30,36

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: