Abstract:Shihu Gold Mine is a new one where the occurrence of ore veins was complicated and the difficulty in mining technology was considerable. In order to ensure that the production of mine will be reached smoothly and realize the protective mining of mineral resources, an experimental study on upward slice stoping and filling with waste rocks for the steep thin-veins was made in this mine, with a success and better result.