Abstract:The experiment was performed succeessfully on the sublevel open stoping and subsequent filling for eastern extra-thick rich orebody in Deep Copper mine, Baiying Nonferrous Metals CO,many measures of earth pressure control were used, thus the sta-bility of open stope with a span of 20m under condition of moderately stable tuff was en-sured, and the intensified mining and ore removal were achieved.