点柱式充填法在应用中存在的问题及改进措施
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD853.34

基金项目:


PROBLEMS EXISTING IN APPLICATION OF POINT-PILLAR FILL STOPING AND IMPROVEMENTAL MEASURES
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    本文总结了点柱式充填法在凤凰山铜矿应用中具有采切工程量小,能有效保护地表设施,能适应矿体形态变化等优点,分析了该法在生产中存在的安全性差、采矿损失大、施工管理困难等问题,同时提出了改进措施.对同类矿山的生产和建设有借鉴和参考意义.

    Abstract:

    The author summarizes the advantages of small development and cut-off work, effective protection of surface installation and adaptation to change of orebody mor-phology etc showing in the application of point-pillar fill stoping in Fenghuangshan copper mine, analyzes the problems of this mining method on poor safety, great ore loss and diffi-cult operating management etc existing in mining production, and puts forward the im-provemental measures. This paper is of a referential importance to the similar mines.

    参考文献
    相似文献
    引证文献
引用本文

马峰.点柱式充填法在应用中存在的问题及改进措施[J].矿业研究与开发,1996,(Z1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: