BOTTOM STRUCTURE OF STOPE FOR VIBRATED CONTINUOUS ORE REMOVAL AND TECHNOLOGICAL RESULTS
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在大量落矿采矿法的采场,普遍采用设有二次破碎水平的底部结构,不但采准工作量大,而且不能解决高效落矿与低效出矿的矛盾.为此,凤凰山铜矿大胆革新,设计采用无二次破碎水平、振动连续出矿的平底底部结构,较好地解决了上述问题,取得了满意的效果.

    Abstract:

    In the stope for the mass caving method, the bottom structure, at which the secondary crushing level was arranged, was used generally. This layout not only was heavy in developmental work but also could not solve the contradiction of high-efficiency caving with low-efficiency ore removal. As viewed from this, a bold innovation has been conducted in Fenghuangshan copper mine. A bottom structure with flat sill, without se-condary crushing level, for vibrated continuous ore removal has been designed to use for solving the previous problems, with a better and satisfactory result.

    参考文献
    相似文献
    引证文献
引用本文

吴胡颂.振动连续出矿采场底部结构及工艺效果[J].矿业研究与开发,1996,(Z1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: