Abstract:The shrinkage method and the cut wall filling method were used to mine the steep orebody with a high grade in Dashuiqing gold mine, which resuled in greater dilution and loss as well as the unsafe. As viewed form this, the panel upward horizontal cut-and dry filling method has been tried to use for this orebody mining, with a better results. This paper describes the selection and design of this mining method and the main features of stoping and filling technology.