Abstract:After designing and constructing a new explosive processing plant in Nanfen surface iron mine,there are many technical problems on the ground installations designed originally,which were found in the process of trial production,thus it is, necessary to perform the reforming design and develop the relative equipment. The mormal production requirements were met after reforming. The conditions were provided for removing the explosive processing plant in time and ensuring the wall slash working to be performed smoothly.