漓渚铁矿矿块崩落法放矿计算机控制与管理
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


COMPUTERIZED ORE-DRAWING CONTROL IN BLOCK CAVING SYSTEM AT LIZHU IRON ORE MINE
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    根据矿块崩落法的放矿特点,运用微机进行月放矿计划编制、日和月放矿指令的发布以及日、周、月以及总的放矿资料统计。此方法成功地应用于漓渚铁矿不稳固矿体中的放矿管理,使矿块视在矿石回收率达到100%,矿石贫化率低于20%;使矿山放管理智能化、自动化,使矿山生产更加科学化。

    Abstract:

    Taking into account the ore drawing features in the block caving system, a microcomputer is used to arrange monthly drawing plans, give daily and monthly ore-drawing instructions, and collect statistics on the basis of each day, each week, each month and total ore-drawing amount. The successful application of this computerized ore drawing control system to the unstable orebody at Lizhu Iron Ore Mine has raised the apparent ore recovery up to 100% and has resulted in the ore dilution rate less than 20%. Further, ore drawing control can be automatized by means of artificial intelligence, thus bringing better scientific management to the mining operation.

    参考文献
    相似文献
    引证文献
引用本文

刘东,肖国清.漓渚铁矿矿块崩落法放矿计算机控制与管理[J].矿业研究与开发,1992,(Z1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: