中深孔超前切顶房柱法在缓倾斜中厚矿体中的应用
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


APPLICATION OF MIDDLE-LENGTHENED HOLE ROM-AND-PILLAR MINING WITH ADVANCED OVERCUT IN GENTLE DIP MID-THICK OREBODY
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    中深孔超前切顶房柱法改进了传统房柱法的回采方案,较好地解决了高大空场采矿作业的安全与采场运搬问题。本文介绍该法的回采方案及采矿工艺;并将技术经济指标与分段空场法加以比较。

    Abstract:

    Middle-lengthened hole room-and-pillar mining with advanced overcut is a modification of the traditional room-and-pillar method and shows a better solution to the problems related to operation safety andstope ore handling, as encountered in the large and high open stopes. This modified system is presented in the paper,including the stoping scheme and mining technique. Furthermore, its tech-economic indices are compared with those of the sublevel open stope method.

    参考文献
    相似文献
    引证文献
引用本文

梁桂长.中深孔超前切顶房柱法在缓倾斜中厚矿体中的应用[J].矿业研究与开发,1992,(Z1):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: