Abstract:This paper has briefly introduced the application and development of cut-and-fill mining method in China gold mines, and has described the technology of stoping and filling on controlled blasting, layout of reinforcing bars, determination of the filling material strength, and selection and ratio of filling materials, last, has given the achievement of new technique study, such as. laying crushed stone layers, covering plastic films, using waste steel ropes for fastening slusher rear wheel and steel pipe for fill material transport and ventilation prior to filling, and installing roof-closing indicator lamp.