Some problems still exist when mining flat-dip thin vein with resuing-and-filling method. However, when the technology of tightened filling with oriented pin-point blasting is adopted, over 80% of manual filling work is saved, the dilution and loss of ores effectively controlled and working conditions improved, resulting in a big increase in stope productivity and yielding remarkable economic effect and social benefits.