夜长坪钼矿自然崩落法初始拉底面积的优化
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD853.364

基金项目:


Optimization of Initial Undercut Area for Block Caving in Yechangping Molybdenum Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    卢氏县夜长坪钼矿采用浅孔留矿法开采,制约了矿山的发展。为满足扩大生产规模的需要,对该矿应用自然崩落法进行了研究。基于前期研究成果和该矿区的岩体条件,采用数值模拟方法,研究了持续崩落初始拉底面积。研究结果是,原生钼矿的适宜初始拉底面积为2800 m2,氧化钼矿的适宜初始拉底面积为800 m2。

    Abstract:

    In Yechangping Molybdenum Mine,shallow-hole shrinkage stoping is adopted,but this mining method has already restricted the development of the mine.In order to meet the requirement of enlarging production scale,the adoption of block caving system to the mine was studied.On the basis of the results of early research and the conditions of rock mass in the mining area,the initial undercut area for continuing block caving was studied with numerical simulation.The result showed that the suitable initial undercut area for the primary molybdenum ore is 2800 square meter,for the oxidized molybdenum ore is 800 square meter.

    参考文献
    相似文献
    引证文献
引用本文

王世辉.夜长坪钼矿自然崩落法初始拉底面积的优化[J].矿业研究与开发,2010,(3):12-14,44

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-06-17
  • 出版日期:
文章二维码

《矿业研究与开发》严正声明

关闭