A gymnasium stadium with a "Z-shaped" framework structure was demolished using the dual directional folding controlled blasting technology. In order to reduce blasting vibration, a long delay period and big space gag were used to initiate the blasting of the stadium layer by layer. The total blasting time was 4800ms, and blasting result satisfied the design requirement.