Abstract:Bad strata are often encountered in the process of drifting in mines,if improperly treated,they will lead to serious deformation of drift,even collapse,so as to increase the amount of repair work.This paper took level 1280 strike drift of Dragon Head Mine as example to make an approach to the construction technology for drifting in bad strata.