多煤层条带开采的数值模拟研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD823.6

基金项目:


Numerical Simulation on the Strip Mining of Multiple Seams
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    应用非线性有限元法,对条带开采不同层间距的3层煤进行了数值模拟研究,揭示了多煤层条带开采的岩层移动变形规律和岩层内波浪沉降发育规律,及其与层间距,条采尺寸,采出率的相互关系,提出了多煤层条带开采的煤柱留设方法及有限元法煤柱稳定性的评定标准,为工程实践提供了一种理论依据。

    Abstract:

    Nonlinear finite element method was used for the numerical simulation of the strip mining of three seams with different seam distances.The study results revealed the strata displacement or deformation rules and the development rule of wave subsidence in strata during strip mining multi-seams,and their interrelationship with seam distance,strip mining size and extraction rate.The author puts forward a method of remaining coal pillar for strip mining multi-seams and the evaluation standard of coal pillar stability by finite element method, so as to provide a theoretical basis for engineering practice.

    参考文献
    相似文献
    引证文献
引用本文

张俊英.多煤层条带开采的数值模拟研究[J].矿业研究与开发,1999,(5):4-7

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码

《矿业研究与开发》严正声明

关闭