Abstract:In the case of two workshops with the eares lapped each other and only 0. 5m distance between pillar base and wall foot, a woorkshop with H load-bearing pillars was successfully demolished by controlled blastingwith hole pattern arranged in the light of the principle of a blasting method with minor burden and wide hole spacing.