Abstract:The author made an introduction to the scheme selectipn, blasting parameters calculation, intiation network design and safe prevention measures etc related to a project of rock blasting in complicated environments in an area of shenzhen city. Under the precondition of ensured safety,a good blasting result of this project was obtained.