安庆铜矿大孔采矿采场底部结构的改进
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD853

基金项目:


MODIFICATION OF STOPE BOTTOM STRUCTURE IN LARGE-DIAMETER LONGHOLE MINING IN ANQING COPPER MINE
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    安庆铜矿大直径深孔采矿法采场用铲运机出矿,原采场底部结构设计为单侧出矿进路,使铲运机通行不便,出矿效率低,因而将其改进为双过路结构,可在采场两侧出矿,大大提高了出矿效率.

    Abstract:

    LHDs were used for ore removal from stope in large-diameter longhole min-ing in Anqing copper mine. Originally, the bottom structure of stope was designed as sin-gle-side ore removal drift which made the LHD travel unconvenient and ore-removal effi-ciency low. Therefore, the single-side ore removal drift has been changed into dual-drift slructure. In this way, the ore removal from stope can be conducted on the two sides, with a greater efficiency of ore removal.

    参考文献
    相似文献
    引证文献
引用本文

朱怀旭.安庆铜矿大孔采矿采场底部结构的改进[J].矿业研究与开发,1996,(Z1):

复制
相关视频

分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码