计算机采掘计划自动编制系统的研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD672

基金项目:


A STUDY ON COMPUTER AUTOMATIC PROGRAMMING SYSTEM FOR MINING PLANNING
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在矿山采掘计划的编制中,需要考虑的相关因素很多,资源数据复杂,涉及面广,因此难以用人工实现这样复杂的计划编制工作,必须借助于现代计算机技术来完成。本文论述了采掘计划计算机编制系统的设计目标,基本结构与功能及所采用的数学模型。实际应用表明,该系统设计合理,运行稳定可靠,能满足矿山实际生产需要。

    Abstract:

    In the programming of mining planning,there are rnany correlatiOn factorsrequired to be considered,the resource data are varied and the coverage is extensive.There-fore,such complicated programming of the mining planning is difficult to be finished by themanual method,thus needs the help of modern computer technohogy.This paper describesthe design oUectives,basic structure and functions of the computer programming system ofthe mining planning,in cluding the mathematics model which is used.This system is ratio-nal in design,and stable and reliable in operation,and can meet the requirements of mineproduction,as shown in the practical operation.

    参考文献
    相似文献
    引证文献
引用本文

李海其.计算机采掘计划自动编制系统的研究[J].矿业研究与开发,1994,(3):89-92

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码

《矿业研究与开发》严正声明

关闭